in all categories

Construction Scheduler jobs in Coburg VIC 3058

Showing 1 - 20 of 14858 jobs
Sort by
Relevance
Sorry, there were no jobs found for that search criteria.
Jobs you may still be interested in.
Posted 1d ago
Full time · Contract
$90,000 - $100,000

Key points we found

  • Manage commercial agreements and ensure contractual compliance.
  • Collaborate with internal and external stakeholders to support operational projects.
  • Monitor contract performance and assist in resolving disputes.
+60d ago
Full time · Permanent
Similar jobs pay ~$194k - $278k

Pay information not disclosed by advertiser

Key points we found

  • Lead and coordinate aged-care residential developments.
  • Manage daily site operations and ensure adherence to project schedules.
  • Conduct quality control inspections and enforce OHS compliance.
+60d ago
Full time · Permanent
Similar jobs pay ~$74k - $102k

Pay information not disclosed by advertiser

Key points we found

  • Manage scheduling and utilisation of vehicle booking system (VBS) timeslots.
  • Ensure compliance with road and terminal regulations while delivering exceptional client service.
  • Plan and book timeslots, maintain vessel schedules, and manage container movements.
+60d ago
Full time · Permanent
Similar jobs pay ~$97k - $113k

Pay information not disclosed by advertiser

Key points we found

  • Servicing and repairing municipal equipment hydraulic and technical systems.
  • Fault finding and maintenance of waste trucks and compactors.
  • Ability to work unsupervised and as part of a team.
+60d ago
Full time · Permanent
$150,000 - $200,000 Above avg.

Key points we found

  • Manage a portfolio of Mid-Market & Corporate clients generating significant income.
  • Develop relationships with insurance carriers to deliver superior outcomes for clients.
  • Provide high-level support to team members and ensure timely service delivery.
+60d ago
Full time · Contract
Similar jobs pay ~$102k - $127k

Pay information not disclosed by advertiser

Key points we found

  • Join a workshop-based project for at least 26 weeks
  • Work with heavy construction steel MIG fabrication
  • Opportunity for full-time employment after contract
Posted 22d ago
Full time · Permanent
$74,000 - $80,000 Above avg.

Key points we found

  • Prepare and cook a variety of authentic Italian dishes.
  • Ensure food quality, safety, and hygiene standards are met.
  • Collaborate with kitchen staff and supervise junior staff.
+60d ago
Full time · Permanent
$100,000 Above avg.

Key points we found

  • Join a supportive and collaborative team environment.
  • Manage and optimise multi-channel digital marketing campaigns.
  • Build strong, long-term client relationships.
Posted 7d ago
Full time · Permanent
$75,000 - $85,000

Key points we found

  • Undertake a wide range of carpentry duties across new builds, renovations and extensions.
  • Interpret construction drawings and specifications to determine job requirements.
  • Maintain a safe and organised worksite while complying with health and safety requirements.
Posted 54d ago
Contract
$120,000 - $150,000

Key points we found

  • Independent contractor role in online education and leadership development.
  • Flexible remote work with a focus on communication and support for applicants.
  • Ongoing professional development and training opportunities.
+60d ago
Full time · Permanent
$85,000 - $90,000 Above avg.

Key points we found

  • Lead and supervise a team of upholsterers and production staff.
  • Oversee daily production activities to meet quality and delivery targets.
  • Train and mentor team members while maintaining a safe work environment.
+60d ago
Full time · Permanent
$75,000 Above avg.

Key points we found

  • Seeking an experienced chef with restaurant industry experience.
  • Responsibilities include menu planning, food costing, and maintaining food quality standards.
  • Must be available over a 5-day roster and work well under pressure.
Posted 8d ago
Full time · Permanent
$79,000 - $82,000 Above avg.

Key points we found

  • Manage daily operations of the restaurant and bar
  • Ensure compliance with health regulations and quality control
  • Train and supervise front-of-house staff to deliver premium service
+60d ago
Full time · Permanent
$75,000 - $85,000 Above avg.

Key points we found

  • Join a friendly team of passionate people who love cooking and food.
  • Manage kitchen operations and supervise kitchen staff.
  • Plan menus and ensure quality of dishes.
+60d ago
Full time · Permanent
Similar jobs pay ~$80k - $107k

Pay information not disclosed by advertiser

Key points we found

  • Plan and schedule daily transport runs optimising routes and resources.
  • Coordinate with drivers and warehouse teams for seamless execution.
  • Prepare reports on performance and on-time delivery.
+60d ago
Part time · Temporary
$55/hr Above avg.

Key points we found

  • Join a fast-paced in-house creative team on a maternity leave contract.
  • Design retail-led campaigns across various mediums including print and digital.
  • Bring ideas and concepts to life in real-world environments.
+60d ago
Full time · Permanent
$80,000 - $86,000

Key points we found

  • Support site-based coordination and project delivery for residential construction projects.
  • Assist with on-site operations including scheduling, monitoring, and liaising with subcontractors.
  • Ensure compliance with WHS procedures and report site progress and issues.
+60d ago
Full time · Permanent
$150,000 - $170,000 Above avg.

Key points we found

  • Own the design process from discovery to delivery.
  • Build a comprehensive design system from scratch.
  • Design multi-step workflows and advanced analytics for a B2B audience.
+60d ago
Full time · Permanent
Similar jobs pay ~$100k - $112k

Pay information not disclosed by advertiser

Key points we found

  • Permanent workshop-based role
  • Servicing and repairing a diverse fleet of heavy vehicles
  • Occasional travel to other Melbourne metro sites
+60d ago
Full time · Permanent
$50 - $60/hr Above avg.

Key points we found

  • Source and screen trade-qualified Boilermakers for industrial pump equipment maintenance.
  • Candidates must demonstrate welding skills and the ability to interpret engineering drawings.
  • Immediate start with potential for full-time employment.