in all categories

Data Center Construction Specialist jobs in South Coast NSW

Showing 1 - 20 of 1275 jobs
Sort by
Relevance
Sorry, there were no jobs found for that search criteria.
Jobs you may still be interested in.
Posted today
Full time · Permanent
Similar jobs pay ~$72k - $120k

Pay information not disclosed by advertiser

Key points we found

  • Full-time positions available in the fishing industry including Ships Master, Ships Engineer, Master Fisher, and Seafood Processors.
  • Candidates must have relevant experience and appropriate licenses for ranked positions.
  • Seafood Processors require a minimum of 2 years experience with duties including sorting, dressing, and packing seafood.
Posted 15d ago
Full time · Contract
$75,000 - $85,000 Above avg.

Key points we found

  • Prepare and present a variety of café-style dishes including breakfast and lunch options.
  • Supervise kitchen operations and ensure food quality and safety standards are met.
  • Collaborate with management and front-of-house staff to enhance customer experiences.
Posted 7d ago
Full time · Permanent
$100,000 - $130,000

Remuneration dependent upon skills and experience

Key points we found

  • Provide high-level contract administration and procurement support for design/construction projects.
  • Manage project documentation and ensure compliance with contract terms and conditions.
  • Collaborate with suppliers and team members to ensure project success.
Posted today
Full time · Permanent
$80,000 - $85,000 Above avg.

Superannuation will be as per the market norms

Key points we found

  • Hiring multiple positions for curry and tandoor chefs.
  • Manage daily kitchen prep and workflow during peak hours.
  • Ensure food quality, safety, and hygiene compliance.
Posted 7d ago
Full time · Permanent
$70,000 - $90,000 Above avg.

Key points we found

  • Prepare and bake a variety of bakery and pastry products.
  • Monitor baking processes to ensure quality standards are met.
  • Maintain cleanliness and organisation in the bakery area.
Posted 1d ago
Full time · Permanent
$79,423 Above avg.

Key points we found

  • Reading and interpreting plans and specifications
  • Constructing, installing and repairing walls, floors, roofs and frameworks
  • Working alongside civil construction teams on water, drainage and infrastructure projects
Posted 10d ago
Full time · Permanent
Similar jobs pay ~$72k - $120k

Pay information not disclosed by advertiser

Key points we found

  • Full-time positions available in the fishing industry based in Ulladulla, NSW.
  • Applicants must have relevant experience and qualifications for specific roles.
  • Positions include Ship’s Master, Ship’s Engineer, Master Fisher, Ship’s Officer, Deck Hand, and Fishing Hand.
Posted 16d ago
Full time · Permanent
Similar jobs pay ~$72k - $120k

Pay information not disclosed by advertiser

Key points we found

  • Full-time positions available in longline fishing company.
  • Candidates must have relevant experience and appropriate licenses.
  • Salary negotiable based on qualifications and experience.
Posted 2d ago
Full time · Permanent
Similar jobs pay ~$72k - $120k

Pay information not disclosed by advertiser

Key points we found

  • Full-time positions available in the fishing industry including Ships Master, Ships Engineer, Master Fisher, Ships Officer, Deck Hands & Fishing Hands.
  • Candidates must have relevant experience and appropriate licenses or registrations for ranked positions.
  • Salary negotiable based on qualifications, skills, and experience, with annual salaries ranging from $71,500 to over $120,000.
Expiring in 2d
Full time · Permanent
$70,000 - $85,000 Above avg.

Key points we found

  • Prepare and cook meals to high standards
  • Design menus in collaboration with management
  • Supervise and train kitchen staff
+60d ago
Part time · Permanent
Similar jobs pay ~$60k - $80k

+ Loadings

Key points we found

  • Deliver high-quality, person-centred care to residents.
  • Assess, plan and implement client care within your scope.
  • Ensure clinical quality compliance standards are met.
Posted 8d ago
Part time · Locum
$180 - $0/hr Above avg.

Key points we found

  • Locum cover required from 15 - 18 July 2026.
  • Shift times are from 1400 to 0000.
  • Accommodation is included.
+60d ago
Full time · Permanent
Similar jobs pay ~$80k - $200k

Pay information not disclosed by advertiser

Key points we found

  • Join a thriving, privately owned medical center in Shellharbour City Centre.
  • Provide high-quality, patient-centered care with support from a dedicated team.
  • Enjoy flexible working hours and opportunities for professional growth.
+60d ago
Full time · Permanent
Similar jobs pay ~$9k - $10k

AU$37 - AU$40 per week

Key points we found

  • Drive a rearload waste truck for a reputable company.
  • Ensure safe driving and compliance with regulations.
  • Opportunity for permanent employment after a temp role.
+60d ago
Part time · Locum
$3,050 - $0/day Above avg.

Key points we found

  • Locum cover required from 29 June - 18 July 2026.
  • Shift times are from 0830 to 1700.
  • Must have current AHPRA registration as a medical practitioner.
+60d ago
Part time · Locum
$180 - $0/hr Above avg.

Key points we found

  • Locum cover required from 28 December 2026 - 3 January 2027.
  • Shift times are from 2000 to 0800.
  • Must have current AHPRA registration as a medical practitioner.
+60d ago
Part time · Permanent
Similar jobs pay ~$60k - $80k

+ Loadings

Key points we found

  • Deliver high-quality, person-centred care to residents.
  • Assess, plan and implement client care within your scope.
  • Ensure clinical quality compliance standards are met.
Posted 34d ago
Part time · Locum
$190 - $0/hr Above avg.

Key points we found

  • Locum cover required for Emergency Medicine Registrar position.
  • Shift times from 2300 to 0900 with a pay rate of $190 per hour.
  • Accommodation provided and located near world-class beaches and rainforests.
Posted 34d ago
Part time · Locum
$180 - $0/hr Above avg.

Key points we found

  • Locum cover required for Emergency Medicine.
  • Shift times from 2300 to 0900.
  • Accommodation included for the duration of the locum.
Posted 8d ago
Part time · Contract
$130 - $0/hr Above avg.

Key points we found

  • Locum cover required for specified dates in July and August 2026.
  • Shift times are from 0800 to 1630.
  • Accommodation is included for the duration of the locum.