in all categories

Data Center Construction Specialist jobs in Perth WA

Showing 1 - 20 of 7377 jobs
Sort by
Relevance
Sorry, there were no jobs found for that search criteria.
Jobs you may still be interested in.
+60d ago
Full time · Permanent
Similar jobs pay ~$89k

Pay information not disclosed by advertiser

Key points we found

  • Seeking a Full-time Formwork Carpenter for a major project in Perth.
  • Responsibilities include constructing molds for concrete and securing forms with reinforcement.
  • Candidates must have 3 years of carpentry experience and relevant construction tickets.
+60d ago
Full time · Permanent
$44 - $55/hr

Key points we found

  • Install, maintain, and repair electrical wiring and equipment.
  • Build switchboards and associated components.
  • Perform testing, fault finding, and diagnostics on electrical systems.
+60d ago
Full time · Permanent
$76,000 - $78,000 Above avg.

Above Awards

Key points we found

  • Assist in planning and supervising educational programs for children.
  • Provide high-quality care ensuring safety and wellbeing.
  • Build positive relationships with children, families, and colleagues.
+60d ago
Full time · Permanent
$115,000 - $130,000 Above avg.

Key points we found

  • Manage site operations for shed construction projects
  • Conduct pre-sale site assessments and coordinate construction activities
  • Ensure quality standards and resolve on-site issues
+60d ago
Full time · Permanent
$76,515 - $83,000

Key points we found

  • Draft, negotiate, and review contracts with clients.
  • Conduct risk assessments and provide legal guidance.
  • Manage contracts and handle disputes effectively.
+60d ago
Full time · Permanent
$80,000 - $95,000

Key points we found

  • Lead the front of house team and oversee venue operations.
  • Manage wine purchasing and contribute to the wine program.
  • Recruit, train, and manage hospitality staff.
+60d ago
Full time · Permanent
$75,000 Above avg.

Key points we found

  • Provide accounts payable and receivable services
  • Conduct payroll and bank reconciliations
  • Prepare financial reports and ensure regulatory compliance
Posted 15d ago
Full time · Permanent
$90,000 - $200,000

Key points we found

  • Full-time Mechanical Engineer position with a minimum of 38 hours per week.
  • Involves working on major projects within a supportive team environment.
  • Candidates must have a relevant degree and at least 12 months of experience.
+60d ago
$75,000 - $85,000 Above avg.

AUD$75000-AUD85000 plus 12.0%superannuation

+60d ago
Full time · Permanent
$35/hr Above avg.

Full time or Casual

Key points we found

  • Provide compassionate and person-centred care to individuals with disabilities.
  • Assist clients with daily living activities and facilitate social and recreational activities.
  • Collaborate with multidisciplinary teams to deliver tailored support.
Posted 7d ago
Full time · Permanent
$70,000 - $90,000

Key points we found

  • Prepare detailed drawings and plans in accordance with project specifications.
  • Collaborate with engineers and architects to understand design requirements.
  • Ensure compliance with relevant codes, standards, and regulations.
+60d ago
Full time · Permanent
$35 - $50/hr

Key points we found

  • Join a well-established mechanical workshop with over 30 years of experience.
  • Perform regular vehicle servicing, suspension repairs, and wheel alignments.
  • Work in a supportive team environment with a consistent workload.
Posted 47d ago
Full time · Permanent
$70,000 - $80,000

Key points we found

  • Lay bricks, blocks, and other masonry materials according to plans and specifications.
  • Construct and repair walls, partitions, arches, and other structures.
  • Maintain a safe and clean work environment.
Posted today
Full time · Permanent
$85,000

Key points we found

  • Prepare and deliver high-quality dishes in a fast-paced kitchen environment.
  • Manage kitchen production and supervise kitchen staff to ensure operational excellence.
  • Collaborate with management on menu development and maintain food safety standards.
+60d ago
Full time · Permanent
$79,499

Salary: starting from $79,499.00

Key points we found

  • Perform diagnostic tests on diesel vehicles to identify faults.
  • Conduct repairs and maintenance on engines, steering, transmission, and braking systems.
  • Maintain detailed records of serviced vehicles and interact with customers.
Posted 7d ago
Full time · Permanent
$75,000 - $85,000

Key points we found

  • Interpret engineering drawings and fabrication plans to determine job requirements.
  • Prepare and shape metal materials using various tools and techniques.
  • Inspect completed welds and fabricated assemblies for quality compliance.
+60d ago
Full time · Permanent
$75,000 - $80,000 Above avg.

Key points we found

  • Carry out servicing, maintenance, and mechanical repairs on a range of vehicles.
  • Diagnose mechanical faults using appropriate diagnostic tools and equipment.
  • Conduct inspections to ensure vehicles meet safety and roadworthiness standards.
Posted 7d ago
Full time · Permanent
$80,000 - $95,000

Key points we found

  • Support the operation, security, and maintenance of computer networks and ICT systems.
  • Provide technical support across network devices, workstations, and general ICT services.
  • Assist users with network access, permissions, and general ICT issues.